The Bear Creek School

8525 208th Ave NE, Redmond, WA 98053

The Bear Creek School has identified an opportunity to expand its athletic program with a new Athletic Fieldhouse on its Redmond campus.

The Fieldhouse is a ground-up facility that will give the school’s student athletes new space for practice and competition. The new building is expected to be complete in November 2028.

Spectrum is serving as Owner’s Representative, managing entitlement and permitting, design, contractor selection, and construction through occupancy.

  • Owner/ Client The Bear Creek School
  • Location Redmond, WA
  • Size 22,000 SF
  • Completion November 2028

8525 208th Ave NE, Redmond, WA 98053

The Bear Creek School

8525 208th Ave NE
Redmond, WA 98053

Contact

Interested in learning more?

This field is for validation purposes and should be left unchanged.
Orenda building exterior

Multifamily & Mixed-Use

Orenda at Othello Square

Building exterior with water and sunset in the background

Student Housing

Stateside

Ballard Food Bank exterior shot

Community Non-Profit

Ballard Food Bank

Reverb building exterior, view from corner with city in the background

Multifamily & Mixed-Use

Reverb

Meridian Center for Health building exterior with walking path

Healthcare

Meridian Center for Health

Burl rendering side angle

Multifamily & Mixed-Use

Burl